17.55 MW Solar Project – Paithan CSN, Maharashtra

Project Type: Ground Mounted SolarCapacity: 17.55 MWLocation: Paithan, Maharashtra 1. Project OverviewThe 17.55 MW solar project at Paithan has commenced with initial site preparation activities. Major works including site clearance, land development, layout marking, and fencing are currently in progress. Execution is being carried out as per planned schedule with focus on quality and timely

Piramal Mahalakshmi

LocationMahalakshmi Railway station Product UsedExcellence PU Foam and For gap filling Sika Flex Sealant Problem/ Issues FacedWall and the slab there was a 10 15 mm gap was present. So Sampling was done. Uniqueness of the product application Customer FeedbackUnsure, technical team rejected it, only sampling was done. Application Procedure 1.Surface PreparationSubstrate Surface Preparation Is