Project Completion Certificate

Viveka Smaraka – Swami Vivekananda Cultural Youth Centre

Excellence Organisation Pvt. Ltd. successfully completed the painting and coating work for Viveka Smaraka – Swami Vivekananda Cultural Youth Centre, Mysuru, Karnataka, using KEM Mineral Paints.

The project was executed using KEM 9546 LASUR, selected for its suitability as a high-quality mineral-based coating solution and its ability to provide an attractive and durable finish.

Project Details

Project Information Details
Project Name Viveka Smaraka
Project Type Swami Vivekananda Cultural Youth Centre
Location Mysuru, Karnataka
Contractor / Applicator Excellence Organisation Pvt. Ltd.
Product Used KEM 9546 LASUR
Product Category KEM Mineral Paints
Colour Shade Concretal LASUR 9546
Application Method Roller Application
Number of Coats 2 to 3 Coats
Mixing Ratio 1:12
Putty Requirement No Putty Required
Architect Mr. Ravindra Kumar, Pragurup
Date of Completion 15 June 2026
Certificate Issued By H.A. Vinod Kumar B.E., Civil Engineer & Contractor

About the Project

The Viveka Smaraka – Swami Vivekananda Cultural Youth Centre is a notable project located in Mysuru, Karnataka. Excellence Organisation Pvt. Ltd. carried out the specified coating and painting work using KEM Mineral Paints.

For this project, KEM 9546 LASUR was applied in the Concretal LASUR 9546 colour shade. The application was completed using a roller application technique with 2 to 3 coats, following a 1:12 mixing ratio.

A key feature of the specified application system was that no putty was required, allowing the mineral coating system to be applied directly as per the recommended surface preparation and application process.

KEM 9546 LASUR – Product Used

KEM 9546 LASUR was the primary coating product used for the Viveka Smaraka project.

The product was selected as part of the KEM Mineral Paints system to achieve the required aesthetic finish and coating performance for the project.

Product Highlights

  • Mineral paint coating system
  • Suitable for architectural applications
  • Concretal LASUR 9546 colour shade
  • Roller application
  • 2 to 3 coat application
  • 1:12 mixing ratio as specified for the project
  • No putty required as per the project application specification

Project Completion Certificate

The project was formally certified as successfully executed by M/s Excellence Organisation Pvt. Ltd. using KEM Mineral Paints.

The completion certificate was issued by:

H.A. Vinod Kumar B.E.
Civil Engineer & Contractor
Mysuru, Karnataka

Date of Completion: 15 June 2026